Saturday, November 10, 2018

WEEK 17 (FYP 2)

WEEK 17 : Submit the report (Chapter 1-5)

OBJECTIVES:
1) To finalize the report for chapter 1 until 5.
2) To submit the report to supervisor.

METHODOLOGY:
1) Do all the correction before submit to supervisor.
2) Add some addition info that can give extra marks.
3) Complete all the report for last submission.
4) Ask the supervisor to check the report before the deadline of the report.

RESULT: Report was submitted to supervisor.

ANALYSIS AND DISCUSSION:
From this subject, I gained more knowledge and skill to write a good report that can give a good marks. Besides, I learn how to find a problem and solve the problem to finish up my FYP project and get more experience to analyze some journal

CONCLUSION:
By completing all this report, basically this is the last task of this subject. This subject made us get many information and knowledge that we can apply during working time later. We learned a lot during making the project. There are a lot of challenges during preparation of the project from final year project 1(FYP 1) until FYP 2 but, this is one of the best memories throughout studying at UniKL BMI.

WEEK 16 (FYP2)

WEEK 16: Chapter 5 (Conclusion and Recommendation)

OBJECTIVE:
1) To make a conclusion of my project.
2) To find a recommendation to improve of my project.

METHODOLOGY:
1) Use an internet and journal to get information of my project.
2) Find the benefit of home automation system to present in my report.
3) Find the limitation for the system.
4) Think an idea as the recommendation of this project.

RESULT:
Figure 48: Example of chapter 5 for my project.

ANALYSIS AND DISCUSSION:
There are many benefits that we can get from home automation system but, there are also had a limitation in my project that I write in my report. On top of that, many recommendation that we can made to improve the system of this project.

CONCLUSION:
As the conclusion, all the conclusion has been conclude in the report and the recommendation has been described so that the report was fulfill all the requirement need from the university.

WEEK 15 (FYP 2)

WEEK 15 : Chapter 4 (Result and Discussion)

OBJECTIVE:
1) To make a result of my project.
2) To describe all of the function for each component.
2) To completed the project with the specified time.

METHODOLOGY:
1) Take every result for each components(part by part).
2) Make sure the coding synchronize with the component.

RESULT:
Figure 47: Example of chapter 4 in my report.

ANALYSIS AND DISCUSSION:
It can be summarize as the overall result of my project. In this chapter, the functionality for each of the components has been described in more details. The connection for each of the components also has been described too. This report result was nicely being write with an example for each part as an evidence during making this project. 

CONCLUSION:
In conclusion, this chapter can describe all the result of my project and the objectives of the project was successfully achieved.

Friday, November 9, 2018

WEEK 14 (FYP 2)

WEEK 14 : Presentation Day

OBJECTIVE :
1) To present the poster and project to an assessor.
2) To know the feedback of my project from the assessor.

METHODOLOGY:
1) Explain about the project briefly to the assessor.
2) Show the poster to assessor for further process.

RESULT:
Figure 44: My project and poster is ready to present

Figure 45: After the presentation

Figure 46: My supervisor, Sir Zaki.

ANALYSIS AND DISCUSSION:
During the presentation, the development Internet of Things (IOT) application for home automation system is presented to the assessor. Everything is working as an expected based on the plan. All part and connection was explained to assessor in detail to make them understanding about my project .

CONCLUSION:
All result show as proof that this project was done successfully as planning and expected and can proceed to the next step which is a final report to fulfill the university requirements.



WEEK 13 (FYP 2)

WEEK 13: Poster For Presentation

OBJECTIVE:
To finish the poster for the presentation for A1 size.

METHODOLOGY:
Use power point 2013 to design the poster.

RESULT:
Figure 43: Poster of my project

ANALYSIS AND DISCUSSION:
Poster done based on the requirement need from the university.

CONCLUSION:
Basically after finish doing a poster, it show that the project is around the corner to be presented to the accessor. All the details was filled inside the poster as the reference for the accessor to refer during presentation.

WEEK 12 (FYP2)

WEEK 13 : Make a model for my project and install the hardware into the model

OBJECTIVE :
1) To make a housing cover for my project.
2) To solder my hardware on the strip board.

METHODOLOGY :
1) Prepare the foam board for my house model.
2) Cut the foam board based on house model design.
3) Use a hot glue gun to connect between the foam board.
4) Use a wallpaper to make the foam board is more attractive.
5) Soldering all the components into the strip board.

RESULT :
Figure 40: The house model is completely done

Figure 41: Furniture is install inside the house model

Figure 42: The hardware is install properly inside the house model

ANALYSIS AND DISCUSSION :
The connection on the strip board must be solder properly. Multimeter was used to test the connection. Then, solder pump was used to uninstall the lead nicely. When the solder part is done, install all the hardware in the house model properly. During install the wiring into the house model, it must be not too tight because it will disturb the system. For the model, hot glue gun was used and must not put the glue too much between the foam board. Knife was used during making the model to cut the foam board so that the foam board has a nice cutting. Last but not least, furniture was install inside the house model so that it will make my project more interesting.

CONCLUSION :
As the conclusion, the model and hardware is done properly within the time given.

WEEK 11 (FYP 2)

WEEK 12 : Set up new hardware

OBJECTIVE:
1) To build my final year project based on the new hardware.
2) To determine my new project hardware is  completely function.

METHODOLOGY:
1) Connect the PIR sensor at D6 node MCU pin.
2) Connect the LDR 1,2 and 3 sensor at
3) Connect LED 1,2 and 3 at pin
4) Set up Blynk application for this project.
5) Add 3 buttons, 4 LED  and 1 timer in the Blynk application.

RESULT :
Figure 38: New hardware of my project.

Figure 39: New project is functioning well

ANALYSIS AND DISCUSSION :
When there has a movement on the PIR Sensor, the signal will trigger and will turn ON the LED in the Blynk application. User can set up timer to turn ON three LED. When the LED is ON, it will trigger the LDR sensor and will send the signal to the Blynk application. The LED on the Blynk application that represent the home appliances will turn ON.

CONCLUSION:
As the conclusion, the new hardware function successfully.